ReCal MAXEvery operation. Every dollar.

Designed for collision repair professionals

Identify what the estimate missed.

Upload a CCC ONE or Mitchell estimate. ReCal MAX reviews every line and reports the billable items that are not included, each with labor hours and a low and high price.

CCC ONE and Mitchell PDFs · Printable reports · Developed in operating collision repair shops

Estimate Review ReportSample report
Vehicle
2018 Toyota Camry XSE
Paint
White Pearl
Estimate
CCC ONE, 79 lines reviewed
Potential additional billing$1,371 – $2,532
Missing items33
Labor hours15.4 – 25.7

Body labor

No.Missing itemHoursLowHigh
1Estimate lines 21, 410.6 – 1.0body labor$40$66
2Estimate lines 410.3 – 0.5body labor$20$33
3Estimate lines 25, 410.2 – 0.3body labor$13$20

Refinish labor

No.Missing itemHoursLowHigh
13Estimate lines 801.2 – 2.0refinish labor$79$132
View all 33 items
CCC ONE and MitchellLow and high pricesVIN checked against NHTSAPrintable reportsSupplements re-run at no charge
01

Upload the PDF

Upload the estimate exactly as it is exported from CCC ONE or Mitchell.

02

Every line is reviewed

Each operation is compared against a shop-developed list of items that are commonly left unbilled.

03

Receive a priced report

Missing items are grouped by labor type, followed by supplies and materials and sublet, with totals, ready to print.

What it identifies

The items adjusters omit and shops overlook.

ADAS calibrations

Manufacturer-specific calibrations and checks, with the VIN checked against NHTSA.

Refinish operations

Refinish operations that are commonly left unbilled.

Glass

Operations associated with removing or replacing glass.

Mechanical

Mechanical operations that result from the repair.

Structural

Operations associated with structural and frame repairs.

Additional body operations

Smaller items that accumulate on every repair.

Every operation. Every dollar.

Seven days at no charge. Upload as many estimates as you need. No long-term contract; cancel at any time.

Start Free Trial